Credits
Production Company: Filmmaster MEA
Project manager: Michael Stroobants – David Vandevelde
d3 operator: David Vandevelde, Kjell Rijntjes
Video/project engineers: Sander De Wandel, Tim Lerat, Iannis Iliadis, Sander De Schrijver, Siel De Schepper, Dries Van Havermaet
Motion control: Wi Creations.
Filmmaster’s production manager Julien Poncelet
Technical manager Olivier Bierwertz
Scaffolding: AES Dubai
Video Equipment: Video Equipment Rental Europe
Filmmaster decided to relay on Visual Solutions for the technical video management of this challenging project.
The challenge was to make two 30 x 5 metre LED sections that could smoothly open and close in sliding door style.
Extreme heat and weather conditions made this project very challenging.
We especially chose to use a 15mm LED screen with big shaders against sunlight.
The show was held at 2pm in the afternoon making it very sunny circumstances.
We used 2 d3 4×4 VFC server to play the show.
We ensured the client could have a:
– Visualisation of the screens with content in d3 with the screen opening and closing
– fluent and very flexible way of playing out bgnd images, high res video clips, PPT, live feeds,… and this all with maximum flexibility.
– show rehearsals, while other people of the team were still working on parts of the stage.