Credits
Client – Litecom (PM: Girts Putelis)
Visual Solutions Video Crew :
– Micha Stroobants (Crew Chief – preproduction manager)
– Tim Lerat (LED-Engineer)
– Justin Catita (LED-Engineer)
– Daniel Saove (LED-Engineer)
– Tom Prew (LED-Engineer)
– Pete Finn (LED-Engineer)
Video Equipment: Video Equipment Rentals Europe
Content and Servers: Visual-Bandit
This year’s edition “The Year of the Tiger” happened on 5th and 6th of August 2016 in Stockholm, Sweden.
It was a huge success.
Visual Solutions carried out all video preproduction and on-site LED engineering for Litecom (Sweden) and VER.
Michael Stroobants (Visual Solutions) took the lead of this and combined a crew from within Europe.
Mainstage:
– 580 * BR15 LED Panels, all custom mapped over 6 different screens. Including a mainscreen of 70sqm and a dj-riser of 39m wide and 2m high!
– Load-in time 1 day, Load-out : 4h
Future stage:
– 98 * BR15 LED Panels
– Building time 1/2 day, Load-out 2h!