Credits
Production Company: Filmmaster MEA
Project manager: Michael Stroobants (Visual-Solutions)
d3 operator: Andy Coates
Video/project engineers: Sander De Wandel, Tim Lerat, Iannis Iliadis, Siel De Schepper, Dries Van Havermaet, Xavier-John Elleboudt
Filmmaster’s production team: Julien Poncelet, Ilmi Lemaire, Tatiana Cadoux, Candice Wachel, Olivier-bob-Bierwertz, Michael Depypere,….
Video Equipment: Video Equipment Rental Europe & Phlippo Showlights.
Filmmaster decided for the 2nd consecutive year to relay on Visual Solutions for the technical video management of this challenging project.
The challenge was to make 5 screens of 9m W x 14m H in LED.
Extreme heat and weather conditions made this project very challenging.
Concept was to have 2 types of screens: 10mm opaque and 15mm transparant.
The show was held at 2pm in the afternoon making it very sunny circumstances.
We used 2 d3 4×4 VFC server to play the show.
We ensured the client could have a:
– Visualisation of the screens with content in d3 with the screen opening and closing
– fluent and very flexible way of playing out bgnd images, high res video clips, PPT, live feeds,… and this all with maximum flexibility.
– show rehearsals, while other people of the team were still working on parts of the stage.